Volume 42 - Issue 34 - August 24, 2023
State of Kansas
Department of Transportation
Notice to Contractors
Electronic copies of the letting proposals and plans are available on the Kansas Department of Transportation (KDOT) website at https://kdotapp.ksdot.org/Proposal/Proposal.aspx. The website will allow the contractor to request approval from KDOT to bid as a prime contractor and be included on the “Bid Holders List,” or to be included on the “Non-Bid Holders List” as a subcontractor/supplier. KDOT’s approval is required to bid as a prime contractor. To bid as a prime contractor, KDOT needs to be notified of the intent to bid no later than the close of business on the Monday preceding the scheduled letting date. Failure to obtain prior approval to bid as a prime contractor on any projects listed below will be reason to reject your bid. The Secretary reserves the right to reject bids that do not comply with all requirements for preparing a bidding proposal as specified in the 2015 edition of the Kansas Department of Transportation Standard Specifications for State Road and Bridge Construction.
KDOT will only accept electronic internet proposals using the Bid Express website at https://bidx.com/ks/main until 1:00 p.m. (Central Time) on letting day. The KDOT bid letting will be conducted remotely by audio broadcast only at 3:00 p.m. (Central Time) on letting day. For the conference call information see https://www.ksdot.org/bureaus/burconsmain/lettinginfo.asp. KDOT has tested the process, but in the event of an unforeseen issue, KDOT will provide updates.
Each bidder shall certify that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the submitted bid. This certification shall be in the form of a required contract provision provided by the state to each prospective bidder. Failure to complete the required contract provision and certify the completeness of the preceding statement when electronically signing the proposal will make the bid nonresponsive and not eligible for award consideration.
Projects for the Sept. 20, 2023, letting.
District One – Northeast
Douglas: 23 TE-0496-01 – Baldwin City, 11th Street from High to US-56; High Street from 4th Street to 2nd Street; 2nd Street from Fremont to US-56; Quayle Street from 6th Street to the Middle School, pedestrian and bicycle paths, 1.1 miles. (Federal Funds)
Marshall: 9-58 KA-7038-01 – K-9, from K-99/K-9 north junction east to K-87/K-9 junction, milling and overlay, 4.5 miles. (Federal Funds)
Osage: 70 C-5146-01 – County bridge, located 0.5 mile south and 4.0 miles east of Vassar over 110 Mile Creek, bridge replacement, 0.1 mile. (Federal Funds)
Shawnee: 89 C-5033-01 – Shawnee County, Topeka Boulevard at 57th, University and Gary Ormsby, traffic signals. (Federal Funds)
Wyandotte: 105 N-0728-01 – Edwardsville, 98th Street from Kansas Avenue to north city limits, grading and surfacing, 1.0 mile. (Federal Funds)
Statewide: 36-106 KA-7109-01 – US-36, from the west city limits of Hiawatha east to the Brown/Doniphan County line; US-73, from the south city limits of Hiawatha north to the north city limits of Hiawatha; US-36, from the Brown/Doniphan County line east to the east city limits of Troy and then from the north city limits of Wathena east to the Kansas/Missouri state line, sealing, 33.7 miles. (State Funds)
District Two – North Central
Dickinson: 70-21 KA-7141-01 – I-70, from 2.3 miles east of K-43/I-70 junction east to the Dickinson/Geary County line, pavement patching, 6.2 miles. (State Funds)
Geary: 31 KA-7123-01 – K-57, from 0.2 mile east of US-77/K-57 junction east to the north city limits of Junction City; US-77, from 0.02 mile south of US-77/Lacy Drive junction north to 0.1 mile north of US-77/Lacy Drive junction; US-77, from 0.1 mile south of US-77/Rucker Road junction north to 0.3 mile north of US-77/Rucker Road junction, milling and overlay, 2.7 miles. (State Funds)
Statewide: 28-106 KA-7056-01 – K-28, from the Jewell/Cloud County line east to K-9/K-28 junction; K-28, in Jewell County from K-28/K-148 junction east to the Jewell/Cloud county line, sealing, 22.9 miles. (State Funds)
District Three – Northwest
Logan: 83-55 KA-7002-01 – US-83, bridge #026 over Smoky Hill River located 6.8 miles north of the Scott/Logan County line, bridge repair. (State Funds)
District Four – Southeast
Bourbon: 6 C-5152-01 – County bridge, located 1.0 mile west and 2.8 miles north of Pawnee Station over Tributary to Pawnee Creek, bridge replacement, 0.1 mile. (Federal Funds)
Bourbon: 69-6 KA-7178-01 – US-69, southbound lanes beginning 2.1 miles north of the Bourbon/Crawford County line north 3.8 miles, crack repair, 3.8 miles. (State Funds)
Miami: 169-61 KA-6241-02 – US-169, beginning 3.9 miles south of K-68/US-169 (Baptiste Drive) junction to 1.4 miles south of the Miami/Johnson County line (northbound only), guard fence, 10.7 miles. (State Funds)
Miami: 69-61 KA-6055-02 – US-69, beginning 1.3 miles south of 359th Street north to 0.6 mile south of K-68, guard fence, 10.8 miles. (State Funds)
Montgomery: 75-63 KA-6448-01 – US-75, from Morningside Drive to north city limits, grading and surfacing, 0.5 mile. (Federal Funds)
Woodson: 54-104 KA-6726-01 – US-54, bridge #007 over Cherry Creek Overflow located 6.7 miles east of US-75; bridge #008 over Cherry Creek located 6.8 miles east of US-75, bridge repair. (State Funds)
Statewide: 106 KA-7173-01 – Various locations in Allen, Bourbon, Coffey, Franklin, Greenwood, Labette, Linn, Miami, Neosho, Wilson and Osage counties, mud jacking. (State Funds)
District Five – South Central
Cowley: 77-18 KA-6766-01 – US-77, bridge #102 over BNSF Railroad/F Street located 0.4 mile north of US-77B/US-77 south junction, bridge repair. (Federal Funds)
Kingman: 42-48 KA-6939-01 – K-42, bridge #046 over Wild Horse Creek located 5.1 miles west of K-14; bridge #067 over Chikaskia River located 7.3 miles west of K-14, bridge repair. (State Funds)
Statewide: 55-106 KA-7048-01 – K-55 in Sumner County from K-55/US-81 junction east to the Sumner/Cowley County line; K-55 in Cowley County from the Sumner/Cowley County line east to K-15/K-55 junction, recycle and overlay, 12.0 miles. (State Funds)
Statewide: 281-106 KA-7085-01 – US-281, from K-19/US-281 junction north to the Stafford/Barton County line; US-281, from the Stafford/Barton County line north to 2.5 miles south of the south city limits of Great Bend; US-281 from 2.5 miles south of the south city limits of Great Bend north to the south city limits of Great Bend, sealing, 13.7 miles. (State Funds)
District Six – Southwest
Ford: 56-29 KA-6776-01 – US-56, bridge #064 over the Arkansas River located 2.6 miles northeast of US-56/US-283 south junction, bridge repair. (State Funds)
Calvin Reed
Secretary
Department of Transportation
Doc. No. 051424