Government Website icon

The .gov means it's official.
A .gov website belongs to an official government organization in the United States.

Padlock icon

The site is secure.
The https:// or lock icon ensures you're safely connected to the website and any information you provide is encrypted.

Publications iconKansas Register

Volume 42 - Issue 38 - September 21, 2023

State of Kansas

Department of Transportation

Notice to Contractors

Electronic copies of the letting proposals and plans are available on the Kansas Department of Transportation (KDOT) website at https://kdotapp.ksdot.org/Proposal/Proposal.aspx. The website will allow the contractor to request approval from KDOT to bid as a prime contractor and be included on the “Bid Holders List,” or to be included on the “Non-Bid Holders List” as a subcontractor/supplier. KDOT’s approval is required to bid as a prime contractor. To bid as a prime contractor, KDOT needs to be notified of the intent to bid no later than the close of business on the Monday preceding the scheduled letting date. Failure to obtain prior approval to bid as a prime contractor on any projects listed below will be reason to reject your bid. The Secretary reserves the right to reject bids that do not comply with all requirements for preparing a bidding proposal as specified in the 2015 edition of the Kansas Department of Transportation Standard Specifications for State Road and Bridge Construction.

KDOT will only accept electronic internet proposals using the Bid Express website at https://bidx.com/ks/main until 1:00 p.m. (Central Time) on letting day. The KDOT bid letting will be conducted remotely by audio broadcast only at 3:00 p.m. (Central Time) on letting day. For the conference call information see https://www.ksdot.org/bureaus/burconsmain/lettinginfo.asp. KDOT has tested the process, but in the event of an unforeseen issue, KDOT will provide updates.

Each bidder shall certify that such person, firm, association, or corporation has not, either directly or indirectly, entered into any agreement, participated in any collusion, or otherwise taken any action in restraint of free competitive bidding in connection with the submitted bid. This certification shall be in the form of a required contract provision provided by the state to each prospective bidder. Failure to complete the required contract provision and certify the completeness of the preceding statement when electronically signing the proposal will make the bid nonresponsive and not eligible for award consideration.

Projects for the October 18, 2023 letting.

District One – Northeast

Douglas: 23 TE-0500-01 – Lecompton, various locations, pedestrian and bicycle paths, 1.8 miles. (Federal Funds)

Leavenworth: 92-52 KA-7100-01 – K-92, from the Jefferson/Leavenworth County line east to 15th Street (city of Leavenworth), sealing, 15.2 miles. (State Funds)

Pottawatomie: 24-75 KA-7102-01 – US-24, from 3.9 miles east of the Riley/Pottawatomie County line east to 12.8 miles east of the Riley/Pottawatomie County line, sealing, 8.9 miles. (State Funds)

Riley: 18-81 KA-7043-01 – K-18, from the K-177/K-18 east junction east to the Riley/Wabaunsee County line, milling and overlay, 8.9 miles. (State Funds)

Wabaunsee: 18-99 KA-7088-01 – K-18, from the Riley/Wabaunsee County line east to the K-99/K-18 junction, milling and overlay, 5.2 miles. (Federal Funds)

Wyandotte: 105 U-2436-01 – Bridge in Kansas City, Thorn Drive South of Old Kansas Avenue over Davis Creek, bridge replacement, 0.1 mile. (Federal Funds)

District Two – North Central

Clay: 14 C-5149-01 – Bridge, located 5.3 miles south and 1 mile east of Green over tributary to Spring Creek, bridge replacement, 0.2 mile. (Federal Funds)

Cloud: 9-15 KA-7150-01 – K-9, from the Cloud/Mitchell County line east to the west city limits of Concordia, milling and overlay, 19.4 miles. (Federal Funds)

Jewell: 45 KA-7072-01 – K-128, from the US-36/K-128 east junction north to the Kansas/Nebraska state line; and US-36, from the K-128/US-36 west junction east to the west city limits of Mankato, milling and overlay, 22.8 miles. (Federal Funds)

McPherson: 59 C-5137-01 – Rural Route 304, from Navajo Road to one mile north of Overland Road, grading and culvert, 2.0 miles. (Federal Funds)

Mitchell: 9-62 KA-7083-01 – K-9, from the US-24/K-9 junction east to the Mitchell/Cloud County line, milling and overlay, 9.3 miles. (State Funds)

Morris: 4-64 KA-3944-01 – K-4, bridge #013 over Level Creek located 0.96 mile north of K-149, bridge replacement. (Federal Funds)

Republic: 79 C-5150-01 – Bridge, located 10 miles south and 2.1 miles east of Belleville over Riley Creek, bridge replacement, 0.2 mile. (Federal Funds)

District Three – Northwest

Norton: 283-69 KA-7151-01 – US-283, from Washington Street north 0.2 mile, and from the US-36/US-283 junction north to the Kansas/Nebraska state line, milling and overlay, 11.5 miles. (Federal Funds)

Rawlins: 25-77 KA-6995-01 – K-25, from the Rawlins/Thomas County line north 16.6 miles to the beginning of portland cement concrete pavement (PCCP) in the city of Atwood, milling and overlay, 16.6 miles. (State Funds)

Rawlins: 25-77 KA-6737-01 – K-25, from the US-36/K-25 junction north to the Kansas/Nebraska state line, milling and overlay, 13.2 miles. (Federal Funds)

Statewide: 83-106 KA-5585-01 – US-83, from the I-70/US-83 junction north to the Kansas/Nebraska state line, special, 66.9 miles. (State Funds)

Statewide: 106 KA-7139-01 – K-223, from the K-23/K-223 junction north to the Sheridan/Decatur County line; and K-223, from the Sheridan/Decatur County line north to the K-383/K-223 junction, milling and overlay, 2.6 miles. (State Funds)

District Four – Southeast

Allen: 54-1 KA-7153-01 – US-54, from the end of the portland cement concrete pavement (PCCP) north of LaHarpe east to the Allen/Bourbon County line, ultra-thin bonded asphalt surfacing, 12.3 miles. (Federal Funds)

Greenwood: 400-37 KA-7154-01 – US-400, from the Greenwood/Butler County line, east to the K-99/US-400 east junction, recycle and overlay, 16.3 miles. (Federal Funds)

Neosho: 59-67 KA-5727-01 – US-59, bridge #004 over the Neosho River located 2.4 miles north of the K-47/US-59 junction, bridge replacement. (Federal Funds)

Wilson: 75-103 KA-6924-01 – US-75, from 4.6 miles north of the City of Altoona north to the Wilson/Woodson County line, sealing, 10.4 miles. (State Funds)

Wilson: 103 C-5115-01 – Wilson County, located 1.1 miles north and 0.7 mile east of Roper over Woodruff Creek, bridge replacement, 0.2 mile. (Federal Funds)

Wilson: 400-103 KA-6883-01 – Light towers; #1, 103L0005 east of US-75 at exit to Neodesha; #2, 103L0004 in the median of US-400 and 50 feet south of US-75; and #3, 103L0003 1500 feet north of US-75 on southbound off ramp, lighting, 1.0 mile. (State Funds)

Woodson: 104 C-5154-01 – Bridge, located 7 miles west and 5.5 miles north of the US-75/US-54 east junction over Turkey Creek, bridge replacement, 0.1 mile. (Federal Funds)

Statewide: 106 KA-7079-01 – US-160, from the east city limits of Longton east to the Elk/Montgomery County line; and US-160, from the Elk/Montgomery County line east to the US-160/US-75 west junction, sealing, 24.9 miles. (State Funds)

District Five – South Central

Barber: 160-4 KA-7051-01 – U.S.160, from east edge wearing surface of bridge #041 over Medicine River east to the Barber/Harper County line, ultra-thin bonded asphalt surfacing, 13.9 miles. (State Funds)

Butler: 54-8 KA-7158-01 – US-54, from the portland cement concrete pavement (PCCP)/hot mix asphalt transition north to the 4-lane divide/2-lane northbound lanes, milling and overlay, 8.3 miles. (Federal Funds)

Butler: 196-8 KA-6992-01 – K-196, from the Harvey/Butler County line to K-254, sealing, 18.9 miles. (State Funds)

Cowley: 18 C-5155-01 – Bridge, located 0.5 mile south of Hackney over BNSF Railroad, bridge replacement, 0.5 mile. (Federal Funds)

Edwards: 50-24 KA-7159-01 – US-50, from the west city limits of Kinsley east to the Edwards/Stafford County line, milling and overlay, 22.8 miles. (Federal Funds)

Harper: 39 C-5148-01 – Bridge, located 1 mile south and 3.5 miles west of Harper over Rush Creek, bridge replacement, 0.1 mile. (Federal Funds)

Pratt: 54-76 KA-5784-01 – US-54, from 1.5 miles east of the Pratt/Kiowa County line east for 0.86 mile (westerly extension); and from 3.8 miles east of the Pratt/Kiowa County line east for 0.45 mile (easterly extension) including bridges #503 and #504, grading and surfacing, 1.3 miles. (State Funds)

Rush: 4-83 KA-6998-01 – K-4, from the Ness/Rush County line to the K-4/US-183 junction, sealing, 21.5 miles. (State Funds)

Sedgwick: 54-87 KA-7193-01 – US-54, from the hot mix asphalt (HMA)/portland concrete cement pavement (PCC) transition east of Hillside east to Rock Road, pavement marking, 4.1 miles. (Federal Funds)

Sedgwick: 87 N-0711-01 – Meridian Avenue in Valley Center, from 0.25 mile south of 69th Street to BNSF crossing north of 77th Street; and from Main Street to 85th Street, grading and surfacing, 1.4 miles. (Federal Funds)

Sedgwick: 96-87 KA-7162-01 – K-96, from North Maize Road east to the Arkansas River Bridge, milling and overlay, 5.6 miles. (State Funds)

Sedgwick: 135-87 KA-6934-01 – I-135, bridge #048 over 85th Street located 5.4 miles north of I-235 in Park City, bridge repair. (State Funds)

Sedgwick: 54-87 KA-7160-01 – US-54, from the hot mix asphalt (HMA)/portland concrete cement pavement (PCC) transition east of Hillside east to Rock Road, pavement patching, 1.9 miles. (Federal Funds)

Sedgwick: 54-87 KA-6936-01 – US-54, bridge #118 on south 343rd Street west over US-54, located 3.03 miles east of K-251, bridge repair. (State Funds)

Sumner: 55-96 KA-6436-01 – K-55, from Line Street to Logan Street, pavement reconstruction, 0.5 mile. (State Funds)

District Six – Southwest

Clark: 54-13 KA-5431-01 – US-54 and US-283 intersection, intersection improvement, 0.2 mile. (Federal Funds)

Finney: 83-28 KA-5707-01 – US-83B, bridge #004 over the Arkansas River located 0.74 mile south of the south US-50 junction, bridge replacement. (Federal Funds)

Gray: 23-35 TE-0487-01 – K-23, from Avenue C to Egbert Street, landscaping and beautification, 0.1 mile. (Federal Funds)

Haskell: 56-41 KA-5997-01 – US-56, from Pike Street to Inman Street, pavement reconstruction, 0.2 mile. (Federal Funds)

Calvin Reed
Secretary
Department of Transportation

Doc. No. 051496