Volume 44 - Issue 15 - April 10, 2025
State of Kansas
Department of Transportation
Request for Proposal
EN-1201-26 – Embedded Traffic Engineer
Notice to Consulting Firms
The Kansas Department of Transportation (KDOT) is seeking a qualified consulting firm or team of firms to perform professional services for the project(s) described below. Interested consultants must submit a proposal as laid out herein by 12:00 p.m. (Central Time) April 30, 2025, to be considered for selection.
Consultant Prequalification
Interested consulting firms must be prequalified by KDOT or otherwise demonstrate qualification in the following category(s):
- 231 – Traffic Control Analysis and Design
If a firm is not currently prequalified by KDOT in any of the required categories, a proposal may still be submitted. Firms not prequalified must also provide documentation that demonstrates the firm is qualified for each specified category listed in this solicitation for the project. Firms must use the KDOT prequalification form to provide this documentation. KDOT 1050 Prequalification Category Definitions (Blue Book) can be found at http://www.ksdot.org/descons.asp. Consultants may create a team to meet the prequalification requirements. All firms doing business with KDOT must be registered and in good standing under the laws of the State of Kansas at the time of contracting and must comply with applicable state and federal laws, rules, and regulations.
Background and Scope of Project
The Kansas Department of Transportation, Bureau of Transportation Planning’s Access Management
Unit is seeking assistance to provide technical and engineering services to assist the KDOT Access
Management Unit (AMU) with tasks routinely performed by the AMU Staff with One (1) part-time
engineer. The engineer will be located in the consultant’s office.
Anticipated Consultant Scope
KDOT anticipates the following to be included in the consultant’s scope.
The consultant engineer shall perform tasks and produce the deliverables as described. This person will act as project manager on assigned Access Management Construction Projects; review design plans as assigned by the Special Projects Manager; Assist the Special Projects Manager with review of complex Access Permits and the review of comprehensive traffic impact studies (TIS) and basic TIS for consistency with applicable engineering guidelines and standards, and coordination of agency wide evaluation of these requests and specialized investigations; assist the Special Projects Manager with preparation of access planning instruments and special studies. Preference will be given to engineers with experience in traffic analysis including familiarity with traffic modeling and simulation. Experience with reviewing site drainage studies is also desired. This person must exhibit excellent communication both verbally and written with property developers, consultants, and local public agencies throughout the permitting process and construction projects. This person is a decision-maker and frequently makes independent decisions using strategic and engineering judgement. This is a part-time position for eight (8) hours per week Monday-Friday. The term of this work is from July 2025 to the end of June of 2026. One year term, with option to renew up to three, 1-year terms.
KDOT, at the Secretary’s discretion, reserves the right to retain for subsequent consulting services the consultant selected to provide services associated with this Request for Proposals.
Anticipated Schedule and Key Dates
- Proposals are due by or before 12:00 p.m. (Central Time) April 30, 2025.
- Ranking of proposals is expected to occur on or around May 2, 2025. Negotiations with the most highly ranked firm are expected to begin on or around May 23, 2025. An executed agreement is anticipated around June 13, 2025.
- The program fiscal year for this project is FY2026 (July 2025–June 2026).
- Anticipated Start Date: July 1, 2025
- Target Completion Date: June 30, 2026
Instructions for Proposal
- No cost or pricing information shall be submitted with the proposal. Proposals including cost or pricing information will be considered non-responsive and withdrawn from further consideration.
- The consultant’s proposal must not exceed 4 pages total (including any cover letter, index, etc.). All pages shall be standard letter size (8.5” x 11”). Any page larger than standard letter size will be counted as two or more pages depending on size.
- A single PDF (10 MB maximum size) of the proposal must be uploaded to the appropriate bid form on Bid Express by the proposal due date and time.
- The proposal PDF file name must read:
- “EN-1201-26_Embedded Traffic Engineer FIRM NAME”
- The proposal must be accompanied by Special Attachments No. 8 (“Tax Clearance Certificate”), No. 10 (“Policy Regarding Sexual Harassment”), and No. 12 (“Certification of Company Not Currently Engaged in the Procurement or Obtainment of Certain Equipment, Services, or Systems”). If you need a Tax Clearance Certificate, you can request one at https://www.ksrevenue.gov/taxclearance.html. Allow 2-3 business days for processing. Both attachments are required for every firm involved in a multi-consultant team. Upload these files as instructed in Bid Express.
- The outline in Table 1 below describes the expected proposal organization and content sections.
- Depending on the number and quality of responses received, KDOT anticipates shortlisting (based on proposals) and holding interviews prior to final selection (which may be based on both proposal and interview content). If KDOT deems interviews to be necessary, interview details and requirements and evaluation criteria for the interview will be distributed to shortlisted consultant teams in advance.
- Table 2 lists the evaluation criteria and associated weights which will be used to shortlist respondents and may be considered in final selection.
Table 1: Proposal Content | ||
---|---|---|
Section | Description of Intent | Page Limit |
Cover Letter | 1 Page | |
Project Approach | Demonstrate a unique approach to accomplish the design efficiently and to a high standard. Include cost-effective and optimized solutions to address the anticipated improvements in the design. Include unique qualifications or experience related to the project approach. | |
Approach to Quality Control | Describe methods or procedures your firm will use to provide all drawings, reports and other services with professional quality and technical accuracy. | |
Qualifications and Experience | For key personnel to be assigned to the project provide names, office location, qualifications, education, training, and expertise. Identify their area(s) of responsibility and percent of their time dedicated to the project. List work for which you do not have in-house capability and name the firm you propose to subcontract with. | |
Past Performance | Describe team’s past performance with respect to ability to meet project schedules; quality of work; and ability to control costs on similar transportation projects, especially those performed for KDOT. Include three references and contact information. | |
Familiarity with KDOT and KDOT Traffic Engineering Practices | Describe team’s familiarity with KDOT’s design process and standards. Describe familiarity with KDOT Bureau of Traffic Engineering and its practices. |
Table 2: Evaluation Factors | |
---|---|
Evaluation Factor | Weight |
Qualifications and experience of project manager and other key project team members proposed for services | 20% |
Past performance history for similar projects/services for KDOT | 15% |
Availability to respond to the work | 15% |
Unique qualifications | 5% |
Approach to quality control | 15% |
The quality and completeness of the response | 10% |
Understanding of KDOT Technical Policies | 5% |
Demonstrated understanding of nature and scope of project | 15% |
Contract Terms and Conditions
A standard KDOT agreement for engineering and technical services will be used for professional services project for 1 year with option to renew up to three, 1-year terms. The following special attachments will need to be provided by the selected consultant and all subconsultants with the signed work order following negotiations and will become attachments to the contract.
- Special Attachment No. 8 (“Tax Clearance Certificate”)
- Special Attachment No. 10 (“Policy Regarding Sexual Harassment”)
- Special Attachment No. 12 (“Certification of Company Not Currently Engaged in the Procurement or Obtainment of Certain Equipment, Services, or Systems”)
The selected firm will be asked to enter scope and fee negotiations with KDOT for an Agreement. In the event KDOT cannot reach an agreement with the highest-ranked firm, it will terminate negotiations with such firm and commence negotiations with the next highest-ranked firm, and so on, until either agreement is reached for a satisfactory scope of services for a fair and reasonable price, or KDOT decides to pursue other alternatives.
Questions
All questions regarding this Request for Proposals shall be submitted via Q&A section of bid form in Bid Express.
Questions can be submitted until April 17, 2025; answers will be provided to all prequalified consultants on April 24, 2025.
Calvin Reed
Secretary
Department of Transportation
Doc. No. 053027